6.16. System of multidot injection of fuel (MPI) - removal and installation of elementsThe throttle case
1. Disconnect a returnable spring заслонки and disconnect an accelerator rope.
2. Mark and disconnect all wires and hoses.
3. Turn off four fixing nuts and remove the case.
4. Before case installation remove the rests of an old lining and clear adjoining surfaces acetone or solvent.
Fuel collector
5. Let out pressure from the power supply system.
|
15.6 Remove fixing clips and disconnect wires from injectors
|
6. Mark and disconnect wires of injectors ( 15.6).
|
15.7 Fixing details of the compressor of a central air of air
1. A breaker-distributor cover.
2. Приводной a belt.
3. Central air tubes.
4. Rings.
5. A socket of connection of an electricity.
6. The compressor.
7. A compressor arm.
8. Details of the mechanism of a tension.
9. A nut.
10. A roller.
11. The plug.
12. A long bolt.
13. A spindle.
14. A tension suspension bracket.
|
7. Mark and disconnect all hoses.
|
15.8 Turn off fixing bolts of a fuel collector
|
8. Turn off two fixing bolts and remove a fuel collector together with injectors, демпфером and a regulator of pressure ( 15.8).
9. Installation is spent upside-down removals.
Injectors
|
15.10 Always replace sealing rings of injectors. For simplification of installation grease a ring with gasoline
1. A sealing ring
2. The plug
|
10. Remove a fuel collector and remove injectors from a collector. Installation is spent upside-down removals ( 15.10).
Regulator of pressure of fuel a Regulator fastening outside
|
15.11 For removal of an external regulator of pressure turn off fixing bolts
|
11. Disconnect a vacuum tube from a regulator. Turn off fixing bolts and remove a regulator ( 15.11). Installation is spent upside-down removals.
Twisted regulator
12. Disconnect a vacuum tube.
13. Turn off a counternut and unscrew a regulator. Installation is spent upside-down removals.
|